fully automatic operation system 2.0 for smart metro
tranavi qiji® train autonomous control system (tacs)
urbalis® 888 train control system solution
tranavi® train control system solution
intxis(ctcs2 ato)train control system solution
beidou positioning based train autonomous control system (tacn)
centralized traffic control system (fzk-ctc)
train dispatching command system (tdcs)
railway integrated dispatching system (rids)
computer interlocking system (ilock-ii)
computer interlocking system (ilock)
compute interlocking system (vpi)
full electronic computer interlocking system(ilock-e)
36 km long, 31 stations, designed interval of 85s, operation interval of 100s, and designed maximum speed of 80kph.
on april 10, 2010, the block mode was put into use to carry passengers.
on july 23, 2011, full function of cbtc system entered into service to carry passengers.
on august 9, 2014, it was provided with goa4 (uto) fully automatic operation, which is the highest grade of automation internationally so far.
for the past four years since the opening of automatic operation, the average punctuality rate and delivery rate of line 10 have both reached 99.9%. the average cycling time has been shortened by 600 seconds, the average turnback time shortened by 120 seconds, the average running speed increased by 3 km/h, and the average depot exit and entrance time shortened to 130 seconds. under the same service quality, the number of trains has been reduced by 2, and the number of staff per kilometer has been reduced by 15. it has also realized the tracking of train exit and entrance, significantly improved the operation safety, reliability and efficiency, and greatly reduced the operation and maintenance costs.
by applying urbalis 888 fully automatic train control system, shanghai line 10 has realized automatic operation through the whole process, including automatic train wake-up, operation in the depot, automatic train washing, and automatic operation on the main line. moreover, the control over departure, stop, opening and closing door, and air conditioning and lighting inside the train is all automated, requiring no human intervention.
reduce the impact of manual work on operational efficiency
more effective stop time
reduce the impact of staffs on operation
reduce the impact of driver’s departure or rest on operation efficiency
separate the train crew plan from the operation plan
improve the recovery time from interference in daily operation
easier to enable new timetables
build a multi-functional team
allocate resources according to operation needs or passengers’ needs
low-speed train washing without driver at any scheduled time
reduce staffing
mitigate safety responsibility of operators
reduce human errors
enhance the management of carriage
11f, building 2, shibei one center, no. 21, lane 1401, jiangchang road, jing'an district, shanghai
86 -21-5663 7080
041-35775(railway)