fully automatic operation system 2.0 for smart metro
tranavi qiji® train autonomous control system (tacs)
urbalis® 888 train control system solution
tranavi® train control system solution
intxis(ctcs2 ato)train control system solution
beidou positioning based train autonomous control system (tacn)
centralized traffic control system (fzk-ctc)
train dispatching command system (tdcs)
railway integrated dispatching system (rids)
computer interlocking system (ilock-ii)
computer interlocking system (ilock)
compute interlocking system (vpi)
full electronic computer interlocking system(ilock-e)
ctcs2-200k onboard system is developed by casco with "2oo3" redundant safety platform and fail-safe design, according to the "tentative technical specification of ctcs-2 level train control onboard equipment " and " tentative specification of ctcs-2&3 level train control onboard equipment driver-machine interface (dmi) display " of china national railway group.
ctcs2-200k system has passed sil4 safety certification by an international authoritative third party certification institution and obtained crcc certificate.
comprehensive use of "2oo3" technology to achieve nanosecond clock synchronization and mutual monitoring and failure channel isolation between channels, as well as 2 out of 3 voting for input and output signals respectively, to ensure high system security and availability.
apply multi-redundant structure with redundant key components.
the emergency brake output board is highly reliable with double break output and "2oo3" hardware technology.
the diagnostic and maintenance function of application software is designed based on evc "minimum replaceable unit" principle, and the real-time status of the main control unit and each external device can be viewed through graphical interfaces.
main control unit failure can be located to the board level and channel level, and input and output failure can be located to the code level.
one-stop online inspection of evc boards, antennas, speed sensors, network bus, radios and relays can be realized with tester - the dedicated maintenance equipment, facilitating daily operation and maintenance.
let us make tailored rail transit system solutions for you according to your needs.
let us make tailored rail transit system solutions for you according to your needs.
11f, building 2, shibei one center, no. 21, lane 1401, jiangchang road, jing'an district, shanghai
86 -21-5663 7080
041-35775(railway)